Baseball Stadium Seating Project
We had to install the tiers of concrete in phases, beginning from the bottom and working to the top of the hill. In total there were four concrete ‘pours’ needed to finish the project. One of the concerns we had to address was the direction of waterflow, and that it not run into the field, but rather to the sides of the new seating.
Robotics Lab Slab/Golf Cart Parking/Pathway
Located behind the Middle School Gym, BOSS installed a 6′ golf cart/walking path heading up the hill to the new robotics building. We also installed the slab for the robotics Lab, and the golf cart parking that sits immediately to the left of the building.
Press Box Foundation Slab
SouthTree was contracted by Trinity to build the Press box for the football field. We were honored to install the foundation for the building, and the connecting sidewalks that surround the building.
Sidewalks/Parking Lot Improvements
BOSS installed various parking lot patches and section replacements, as well as connecting various student parking lots together with ADA compliant sidewalks, to allow the growing student faculty to safely walk to many of the new buildings around campus.